top of page

Penobscot Building

In Progress

Detroit

Architect: In House


Performing a complete façade inspection, this includes, securing loose stone, repairing spalled stone, installing thousands of feet of sealant, thousands of feet of tuck pointing.

WP_20160309_003.jpg
Penobscot Building: Project

Gallery

An Inside Look

Penobscot Building: Photo Gallery
bottom of page